Preliminary estimate
Early cost guide based on area and specification level.
Know what your project is likely to cost before you build. Clear, quantity-based estimates that help you plan, compare and control the budget.
Budgets are easier to protect when the numbers are clear from the start. We prepare estimates from your drawings and specifications, breaking the work into quantities and rates that are easy to follow.
Estimates can be updated as the design develops, helping you compare options, decide where to spend, and review contractor quotations with more confidence.
Early cost guide based on area and specification level.
Measured quantities for each trade and item of work.
Quantities of key materials such as steel, concrete, brick and tiles.
Cost of alternative designs, materials or specifications.
Comparing contractor quotes against the estimate.
Revising the estimate as the design changes.
Gather drawings, specifications and requirements.
Take off quantities trade by trade.
Apply current rates for materials and labour.
Discuss the estimate and options with you.
Revise as the design or prices change.
Estimates are based on the information available at the time and current market rates; final costs depend on specifications, site conditions and contractor pricing.
Accuracy improves as drawings become more detailed. Early estimates are a guide; detailed quantities give a much closer figure.
Yes, we can give an early area-based guide, then refine it as drawings are prepared.
Material and labour rates move, so we date every estimate and can update it before you build.
Tell us about your project and we will suggest the right next steps.