Service 11 / 14

Conversion Services

Give an existing building a new life. We convert houses, warehouses and commercial spaces into homes, offices, shops and more.

Overview

New purpose for existing buildings.

Converting an existing building can be faster and more sustainable than building new. The challenge is working with what is already there: the structure, openings, levels and services.

We assess the existing building, test how the new use can fit, and design a conversion that is practical, compliant and full of character.

What's included

What this service covers.

01

Existing building survey

Measured drawings of the current layout and condition.

02

Feasibility study

Testing whether and how the new use can fit.

03

Conversion layouts

New plans for homes, offices, retail, clinics or hospitality.

04

Loft and basement conversion

Turning unused space into useful rooms.

05

House to apartments

Dividing a property into separate units where permitted.

06

Upgrades

Improving light, ventilation, insulation and services as part of the work.

How we work

Our process, step by step.

01 Survey

Record the existing building and its condition.

02 Test

Check feasibility, rules and structure.

03 Design

Develop layouts for the new use.

04 Coordinate

Bring in structural and MEP input.

05 Document

Prepare drawings for approval and construction.

What you receive

Deliverables

  • Existing building drawings
  • Feasibility report and options
  • Conversion floor plans and sections
  • Approval and construction drawings
  • 3D views of the converted spaces
Who it's for

Ideal for

  • Converting a house into offices or a clinic
  • Warehouses into studios or showrooms
  • Splitting a house into apartments
  • Lofts, basements and garages

Structural changes and change of use are subject to engineering assessment and approval by the relevant authority.

FAQ

Common questions.

Is converting cheaper than building new?

Often, but not always. It depends on the condition of the building and the new use, which is why we start with a feasibility study.

Will I need approval to convert?

Change of use and structural alterations usually need approval; we check requirements early.

Can the existing structure stay?

Where possible, yes. A qualified engineer assesses what can be retained and what must be strengthened.

Planning a conversion services project?

Tell us about your project and we will suggest the right next steps.

Start Your Project ↗